Portfolio

Our Work Speaks for Itself

Our work reflects the skill, care and high standards we bring to every project. We understand that every job can evolve, requiring flexibility, adaptability and close attention to detail throughout the process.

By working collaboratively with clients, contractors and wider project teams, we ensure changing needs are managed smoothly while delivering reliable, high-quality results aligned with each project's specific requirements and the highest standards of carpentry.

Clear communication, practical problem-solving and a commitment to excellence allow us to consistently deliver outstanding results with minimal disruption.

Portrait of Ionut Blanaru, IBM Joinery Owner

Ionut Blanaru

IBM Joinery Owner

Barchester Burwood Grange Care Home

2023 • Value: £55,000


Remedial doors:
  • Eased and adjusted doorleaf to reduce excessive perimeter gaps within 3-4mm
  • Signage fitted
  • Fire stopping behind frame
  • Replace faulty smoke seals with new ones
  • Ease and adjust overhead door closer
Fit all the accessories in the en-suite bathrooms
Install gazebo and shed outside garden

White double doors with raised panels, metal kick plates and central handle in corridorCorridor with multiple white panel doors and wooden handrails along wallsBedroom interior with white door, built-in wardrobe and carpeted flooringWhite single door with overhead door closer and metal handle in a plain wall settingWhite double fire exit doors with narrow vision panels and illuminated exit sign above

What stood out for me was how calm and confident they are in their work. No rushing, no guessing. Just steady, skilled work and a really good end result. Would definitely use again.

Emerson Dean

Barchester Mill Court Care Home

2023 • Value: £46,000


Remedial doors:
  • Eased and adjusted doorleaf to reduce excessive perimeter gaps within 3-4mm
1 year snagging:
  • Fill the cracks from walls, ceiling and woodwork. Redecorate all the areas

Care home corridor with white fire doors, wall handrails, fire extinguisher and exit signageWhite panel door with metal kick plate and room signage in a furnished care home interiorWhite fire door with vertical vision panels, overhead closer and access keypad on wallWhite panel door with keypad lock and signage in corridor with wall protection railsWhite room door with number sign and metal kick plate in corridor with coloured wall finish

We use them for a mix of jobs - fire door adjustments, a bit of flooring, and some custom shelving. Everything was done to the same high standard. You don't get feeling they cut corners.

Bramwell Loxley

Barchester Stoneham Grove Care Home

2024 • Value: £220,000


Install 160 fire doors (F30 and F60) and 64 non-fire doors
Install art work
Install composite decking
Install skirting
All second fix
Install all the wood work in the garden (gazebo, pergolas)

White panel doors in corridor with keypad lock, fire exit sign and wall protection railBalcony walkway with composite decking, glass railing and outdoor seating overlooking courtyardLounge seating area with upholstered armchairs, side tables, wall artwork and chandelier lighting by patio doorsDecorative corridor wall with large circular sunburst mirror, panelled wainscoting and carpet flooringDecking substructure with metal joists and support system before final boards installation

Ionut and his team were brought in at a crucial time and immediately provided the multi-trade capability necessary for completion. This versatility allowed us to consolidate multiple aspects of the work under their management, leading to improved efficiency and the successful mitigation of delivery risks.

Danny Bolton, Senior Site Manager, Elmwood Group

Barchester Lotus Manor Care Home

2025 • Value: £120,000


Install 120 fire doors (F30 and F60)
Install art work
Install composite decking
Install skirting
All second fix

Open white door with vision panels leading into clinic room with chair, wall notice board and wooden flooringLounge area with upholstered chairs, round table and decorative wall panelling with lightingCare home corridor with carpet flooring, wall lighting and decorative furnitureDecorative wall feature with large round mirror on coloured panelled wallSeating area with two armchairs and small table by window overlooking garden

I liked that they didn't overpromise anything. Just clear communication, showed up when they said they would, and did the job properly. This is actually rare these days.

Louis Joseph

Barchester Stubbington Manor Care Home

2026 • Value: £25,000


Second fix work

Lounge seating area with armchairs, sofa, round table and decorative wall panelling with artworkDining room with set tables, upholstered chairs, wall panelling and central chandelier lightingBuilt-in shelving and cabinetry with decorative lighting in a communal interior spaceSeating area with two armchairs and wall-mounted shelving displaying decorative items

I was particularly impressed by their composure and self-assurance in their job. Don't guess or haste. Just consistent, expert labor and an excellent final product.

Boomsliter S

Signature at Highgate

2023 • Value: £280,000


Install over 200 F30 doors
Install over 60 F60 doors
Install over 100 non-fire rated doors
Install over 100 kitchens
Install wall panelling
Install over 100 F30 minutes raiser doors
Install over 5000 linear meters of skirting
Install furniture

Stainless steel lift doors set within wood panelled surround with vertical wall lightsWhite door with vision panels and metal kick plate in a corridor with wall panellingDining area with set tables, upholstered chairs and decorative shelving with mirrors and lightingDecorative corridor with illuminated wall panels featuring geometric designs and carpet flooringLobby area with large feature chandelier and decorative geometric partition screensModern fitted kitchen with large island counter, open shelving, wall cabinets and pendant lightingBuilt-in cabinetry and shelving units around a fireplace with decorative wall finish

Following our successful collaboration on the Twickenham Stadium refurbishment in 2019, I had high confidence in Ionut capabilities and brought them on board for the Signature 5-Star Care Home challenge. I do not regret this decision, and they have become a key contributor to challenging, high-profile work.

Jamie Reed, Contract Manager, Woodtech Joinery Ltd (Signature Highgate)

Loft extension Sutton

2022 • Value: £80,000


All the first and second fix carpentry work
Create new bathroom

Loft floor under construction with exposed timber joists, insulation and tools during installationTimber joist structure with metal support bracket installed as part of loft floor reinforcementBathroom installation in progress with tiled walls, shower enclosure frame and bathtub visible from aboveCompleted modern bathroom with black framed shower screen, wall tiles, recessed shelf and vanity unit

I recently hired Floor Fitting for my home project. From the first visit, they were polite and knowledgeable. The finish looks clean and very modern. I'm really happy with how everything turned out.

Girimpuhwe Boaz

Normandy House

2026 • Value: £35,000


Upgrading of 220 existing certified single doors to Fire Qual standards
  • Eased and adjusted doorleaf to reduce excessive perimeter gaps within 3-4mm
  • Signage fitted
  • Fire stopping behind frame
  • Replace faulty smoke seals with new ones
  • Ease and adjust overhead door closer

Blue fire door in corridor corner with floor sign and wall-mounted fire door keep shut noticeClose-up of fire door hinge on blue door frame with QR code inspection labelSingle blue fire door with safety signage in a residential hallwayDouble blue fire exit doors with vertical vision panels and overhead door closerBlue fire door with narrow vision panel and access control keypad in corridor

After a check revealed problems with the current fire doors, we needed some corrective work done. They arrived, gave a straightforward explanation of everything, and resolved the issue.

Harish Imran

John Pound House

2026 • Value: £10,000


Upgrading of 60 existing certified single doors to Fire Qual standards
  • Eased and adjusted doorleaf to reduce excessive perimeter gaps within 3-4mm
  • Signage fitted
  • Fire stopping behind frame
  • Replace faulty smoke seals with new ones
  • Ease and adjust overhead door closer

Close-up of door hinge with measuring tool checking gap between door leaf and frameOverhead door closer installed on white door with track mechanism fixed to frameWhite fire door with overhead closer and metal push plate in stairwell corridorDoor frame with exposed timber and fire stopping material visible during installation work

I give you five star for this amazing service.

Md Aman